Skip to content

Method · Five phases · One protocol

Every engagement runs the same way.

The only thing that changes is the analyte. The protocol — and the standard of evidence — does not.

Phase 01

Consultation

We start with a phone call, then a site walkthrough where needed. The goal is to scope the right test, not the most expensive one.
  • Phone or in-person consultation
  • Site walkthrough when warranted
  • Sampling and analysis plan (SAP) for Phase II+
  • Written quote with regulatory benchmarks

Phase 02

Field Sampling

Our licensed inspector arrives in an unmarked vehicle. Calibrated equipment, chain-of-custody, and a photographic log on every sample.
  • Calibrated instruments (pre-deployment QA/QC)
  • Chain-of-custody documentation
  • Photographic record of sampling locations
  • Real-time data logging where applicable

Phase 03

Lab Analysis

Samples ship same-day to AIHA / NVLAP / NELAP-accredited labs. Standard panels return within 24 hours. Specialty analytes within 48-72 hours.
  • AIHA-accredited mold and IAQ analysis
  • NVLAP-accredited asbestos analysis
  • NELAP-accredited environmental samples
  • Mycotoxin via ERMI / HERTSMI / ELISA / LC-MS

Phase 04

Diagnostic Report

Findings, regulatory comparison, and the recommended next step. No upsells, no scare language. Just data and a plan.
  • Executive summary with pass/fail verdict
  • Comparison to EPA / OSHA / ACGIH / WHO limits
  • Photo-documented findings
  • Remediation scope or No Further Action recommendation

Phase 05

Remediation Oversight (optional)

Where remediation is warranted, we scope the work, oversee the contractor, and verify clearance with independent re-testing.
  • Remedial Action Work Plan (RAWP)
  • Contractor coordination
  • Air monitoring during work
  • Clearance testing and closure documentation

Schedule · 48hr appointment

Unsure about your air? Schedule a test.

48-hour appointment window. 24-hour lab turnaround. Licensed inspectors, unmarked vehicles, statewide coverage in NY and PA.